DALLAS ISD - ORG 200 JJ RHOADS LEARNING CENTER

Competitive Sealed Proposals for ohn F. Peeler Elementary School Renovations

Status

Bidding Closed

Prebid Date8/21/23 4:00pm

Bid Date9/7/23 2:00pm

Company & Contacts

Dallas ISD 2020 Bond Program
Dallas ISD - Procurement Services  
ProcurementCS@dallasisd.org

Location

4401 S. Second Ave., Dallas, TX 75215

All digital files included with purchase of complete printed set via file transfer. Specs seperated by section and plans by sheet names.

Half Size Available upon Request

NOTICE: INVITATION TO BID

SCOPE OF WORK:
Scope of Work. The Work consists of:
1. A renovation of the existing Pre-K spaces on the first floor and gymnasium.
2. A hydronic conversion.

BUDGET:
Total Estimated Construction Budget (CCL + Allowances) for CSP # 207264 $11,121,686.39

PRE-BID & LOCATION: A pre-proposal meeting will be held on Monday, August 21, 2023, at 4:00 PM at Joseph J. Rhoads Learning Center for all interested parties. This meeting is not mandatory, but information discussed will be extremely helpful in preparation of the proposal.

All general contractors and sub-contractors are encouraged to attend this meeting. Contractors will meet A/E(s) and PM at each school to start site tours. The first site tour will take place immediately following the pre-proposal conference. The following is the schedule for all site tours:

BID-DATE & LOCATION:
All Construction Services construction procurements must be physically delivered to the Construction Services office, at the Linus D. Wright Dallas ISD Administration Building 9400 North Central Expressway, Suite 800 Dallas, TX 75231. (Call 972.925.7200 for directions). Delivery to other locations will result in rejection of a CSP.

Completed CSP Package Part 1-A, 1-B and 1-C are due on Thursday, September 07, at 2:00 PM (local time).

Completed CSP Package Part 2 is due on Friday, September 08, at 3:00 PM (local time). Any materials received after the respective closing dates / times will not be considered.

OWNER
Dallas ISD Procurement Services c/o Bond/Construction Services
Linus D. Wright Dallas ISD Administration Building
9400 North Central Expressway, Suite 800
Dallas, TX 75231

OWNER’S PROJECT MANAGER (PM)
Andy Quinones will be the Owner’s Project Manager (PM) for the management of planning, design,
permitting, construction, and post-construction for this CSP. All correspondence and communication
during the contract finalization, construction and post-construction processes shall be directed to the
Architect/Engineer firm (A/E) with copy to Andy Quinones. During construction, the PM shall have
authority to act on behalf of Dallas ISD for Owner related direction.

Andy Quinones, Project Manager
Dallas Independent School District
Construction Services
Linus D. Wright Dallas ISD Administration Building
9400 N. Central Expressway Suite 800
Dallas, TX 75231
Phone: 972-925-7285
E-mail: C88419@dallasisd.org

ARCHITECT/ENGINEER FIRM (A/E)
HarrisonKornberg Architects
100 Glass St, Dallas, TX 75207
Main Contact: James B. Harrison
Phone: 713-550-4277
Fax: 713-229-0692
Email: jharrison@harrisonkornberg.com

BID METHOD:
Competitive Sealed Proposals