GARLAND ISD #500-3.7-18 BP3.7 - S. GARLAND HS, ALT. ED CENTER & COUCH, HEATHER GLEN, VIAL & TOLER ES

Multi-Campus renovations that consists of the renovation of fine arts areas, replacement of mechanical systems, HVAC improvements, replacement of electrical, fire suppression system throughout, renovation of existing, restrooms, replacement of door hardware & leafs for ADA compliance, creation of a secure vestibule, security upgrades, roof repair, flooring replacement and paint in select areas.

Status

Bidding Closed

Prebid Date11/3/17 9:00 am

Bid Date11/30/17 2:00 pm

Company & Contacts

Garland ISD 2014 Bond Program

Huckabee - Heather Barksdale   hbarksdale@huckabee-inc.com

Location

Garland, TX

CD included with purchase of complete set. Specs seperated by section and plans by sheet names.

COMPETITIVE SEALED PROPOSAL (CSP 500-3.7-18)
BP# 3.7 Multi-Campus Renovations

(Org#003 S Garland HS, Org#157 Couch ES, Org#124 Heather Glen ES, Org#053 AEC, Org#136 Toler ES and Org#129 Vial ES)

The Garland Independent School District will be accepting competitive sealed proposals for the renovation work at Multi-Campus locations (Org#003 S Garland HS, Org#157 Couch ES, Org#124 Heather Glen ES, Org#053 AEC, Org#136 Toler ES and Org#129 Vial ES) under Bid Package 3.7 until 2:00 p.m. local time, November 30, 2017 at the Garland ISD Purchasing Construction Bond Department, Marvin Padgett Auxiliary Services Center Building, 701 N. First Street, Garland, Texas 75040, where they will be publicly opened and read aloud starting at 2:10 p.m. local time.

Pre-proposal Meeting: November 3, 2017, 9:00AM, starting at Couch ES, located at 4349 Waterhouse Boulevard, Garland, Texas 75043.

The Garland ISD Minimum Safety Program Guidelines Manual may be accessed at:
http://www.garlandisd.net/sites/default/files/general/attach_2-00_7319-gisd_safety_guide-71_pgs.pdf

Budget: $13,522,526